SEAHC DEMONSTRATION PROJECTS

Colorado

Colorado SEAHC Demonstration Projects

HFS Product Information

The SEAHC HFS demonstrations in Colorado were completed by Crafco, Inc. using the HFS product listed below:

  • Product Name: Crafco HFS system
  • Epoxy Type: Epoxy resin
  • Aggregate Type: Crushed flint

Interstate 25 in Pueblo, CO
Northbound lanes

Due to deterioration of the underlying pavement, this HFS installation was removed during the milling and repaving of the underlying asphalt pavement.

(Note: HFS installation removed)

SITE INFORMATION

Site Location: Interstate 25, Pueblo, CO (milepost 97.75-97.9)

Highway Description: Four-lane median-divided Interstate highway

Pavement Type: Hot-mix asphalt

Approximate AADT: 52,600

INSTALLATION DETAILS

Installation Date(s): September 14 (inside lane) and 15 (outside lane), 2009

Installation Timeframe: 8 am – 5 pm

Length of Installation: 625 ft (2 lanes)

Total Area: 1,667 SY

Installation

Before

After

Interstate 25 in Pueblo, CO
Southbound lanes

Due to deterioration of the underlying pavement, this HFS installation was removed during the milling and repaving of the underlying asphalt pavement.

(Note: HFS installation removed)

SITE INFORMATION

Site Location: Interstate 25, Pueblo, CO (milepost 97.75-97.9)

Highway Description: Four-lane median-divided Interstate highway

Pavement Type: Hot-mix asphalt

Approximate AADT: 52,600

INSTALLATION DETAILS

Installation Date(s): September 14 (inside lane) and 15 (outside lane), 2009

Installation Timeframe: 8 am – 5 pm

Length of Installation: 550 ft (2 lanes)

Total Area: 1,467 SY

Installation

Before

After

State Route 119, Boulder County, CO

SITE INFORMATION

Site Location: Colorado State Route 119, ~11.5 miles south of Boulder, CO (milepost 30.4)

Highway Description: Two-lane rural highway

Pavement Type: Hot-mix asphalt

Approximate AADT: 3,600

INSTALLATION DETAILS

Installation Date(s): September 19-20, 2009

Installation Timeframe: 8 am – 5 pm

Length of Installation: 600 ft (2 lanes)

Total Area: 1,600 SY

Installation

Before

After

US Highway 36, Larimer County, CO

SITE INFORMATION

Site Location: US Highway 36, Larimer County, CO (milepost 11)

Highway Description: Two-lane rural highway

Pavement Type: Hot-mix asphalt

Approximate AADT: 5,700

INSTALLATION DETAILS

Installation Date(s): September 17-18, 2009

Installation Timeframe: 8 am – 5 pm

Length of Installation: 924 ft (2 lanes)

Total Area: 2,464 SY

Installation

Before

After

CONTACT US

Tell us about your pavement needs

We welcome your questions and comments about anything.