SEAHC DEMONSTRATION PROJECTS
Kansas
LEARN ABOUT EACH SEAHC PROJECT:
HFS Product Information
The SEAHC HFS demonstrations in Kansas were completed by POLY-CARB, Inc. using the HFS product listed below:
SITE INFORMATION
Site Location: Northbound I-35 to Northbound I-635 Ramp, Kansas City, KS
Highway Description: Single-lane ramp
Pavement Type: Jointed concrete pavement
Approximate AADT: 26,165
INSTALLATION DETAILS
Installation Date(s): August 20, 2009
Installation Timeframe: 9 am – 5 pm
Length of Installation: 770 ft (1 lane)
Total Area: 1,240 SY
Site Location: K5 (Wolcott Rd.), Leavenworth, KS
Highway Description: Two-lane rural highway
Pavement Type: Hot-mix asphalt
Approximate AADT: 1,717
Installation Date(s): August 18, 2009
Installation Timeframe: 7 am – 5 pm
Length of Installation: 250 ft (2 lanes)
Total Area: 667 SY
Site Location: Eastbound K96 to Eastbound US 54 Ramp, Wichita, KS
Approximate AADT: 6,350
Installation Date(s): August 23, 2009
Installation Timeframe: 8 pm – 5:30 am
Length of Installation: 820 ft (1 lane)
Total Area: 1,321 SY
Site Location: K99, south of Wamego, KS
Approximate AADT: 2,780
Installation Date(s): August 25, 2009
Installation Timeframe: 7 am – 7 pm
Length of Installation: 450 ft (2 lanes)
Total Area: 1,200 SY