SEAHC DEMONSTRATION PROJECTS

Montana

Montana SEAHC Demonstration Projects

HFS Product Information

The SEAHC HFS demonstrations in Montana were completed by POLY-CARB, Inc. using the HFS product listed below:

  • Product Name: POLY-CARB FLEXOGRID
  • Epoxy Type: Epoxy resin/polyamine solution (MARK-177)
  • Aggregate Type: Crushed flint

Northbound I-15 to Westbound I-90 Ramp:
Butte, MT

SITE INFORMATION

Site Location: Northbound I-15 to Westbound I-90 Ramp, Butte, MT

Highway Description: Single-lane ramp

Pavement Type: Chip seal over hot-mix asphalt

Approximate AADT: 12,309

INSTALLATION DETAILS

Installation Date(s): September 1, 2009

Installation Timeframe: 8:30 am – 5 pm

Length of Installation: 1,600 ft (1 lane)

Total Area: 2,489 SY

Installation

Before

After

Southbound US 93:
Missoula, MT

SITE INFORMATION

Site Location: Southbound US 93, Missoula, MT

Highway Description: Four-lane divided highway (RP 85.8 to 86.2)

Pavement Type: Chip seal over hot-mix asphalt

Approximate AADT: 23,820

INSTALLATION DETAILS

Installation Date(s): September 2-3, 2009

Installation Timeframe: 7 am – 4 pm

Length of Installation: 1,375 ft (2 lanes)

Total Area: 3,963 SY

Installation

Before

After

CONTACT US

Tell us about your pavement needs

We welcome your questions and comments about anything.